500 tons / day packing line (1.8-5L)
Civil production line layout: the third floor, second floor, first floor
Production line equipment consists of:
Third floor: carton opening machine, drop box machine, clip bottle conveyor
Second floor: Gas washing machine, filling and capping machine (attach cap elevator), put pressure ring, cold glue […] View